Client case for Bouygues Telecom

Fixed Services Deployment Project Manager
Location
Paris
Project's functional area
Technical migration work: infrastructure change (OS/Oracle) and Informatica Powercenter software version change (9.1 to 9.6 then 10.1).
Technological environment
Informatica Powercenter, Oracle
Detailed description of the project
  • Organization of preliminary study workshops,
  • Design, implementation, acceptance testing, and deployment of the solution in production.
  • Carrying out technical actions (redesign of packaging tool, Powercenter installation, migration of FS/database schemas),
  • Monitoring of the relationship with the IT manager,
  • Drafting of project documents,
  • User support for the various environments and activity reporting.
Drawbacks and key success
Objective: Prepare for technical migration
Action: Gap analysis and implementation recommendations
Result: Smooth transition with no major production issues